Madison Mega Site
An Entergy Qualified Site
A premier site in the heart of a growing industrial center
The Madison County Mega Site is located in a fast-growing and dynamic industrial region, the site offers advanced infrastructure and access to a skill and experienced workforce – all within a major southern metro
Learn MoreSite Features
The Madison Mega Site is 1,025 acres (414.80 hectares) with an available 855 acres (346 hectares)
The site is undeveloped and offers unique features, such as the Mississippi Healthcare Zone
Ownership is public, and the sale is negotiable, based on panel location. Leasing is not an option.
The topography is gently rolling land outside of the city limits, and not in a flood zone.
The zoning is heavy industrial, and the surrounding land is used for commercial, agriculture, and timber industries.
Current Tenants: 750,000 S.F. Amazon Robotic Fulfillment Center
Site Due Diligence: (2018 Completed Surveys)
Infrastructure
Electric
-
Electrical Supplier
Entergy
-
Distance to 3-Phase
On-site
Water
-
Water Supplier
Canton Municipal Utilities
-
Distance to main
On-site
-
Diameter of Water Line
16 inches (40.64cm)
-
Available Capacity
2 MGD with the completion of a one-million gallon elevated tank. (2022 Q2 Completion Date)
Wastewater
-
Supplier
Canton Municipal Utilities
Fiber/telecom
-
Supplier
AT&T, C-Spire, Comcast Xfinity
NATURAL GAS
-
Supplier
Canton Municipal Utilities
Workforce
6
Research UNIVERSITIES
12
FOUR-YEAR EDUCATIONAL INSTITUTUIONS
11
TWO-YEAR EDUCATIONAL INSTITUTUIONS
15
ACCELERATE MS PROGRAMS
Quality of Life
-
Cost of Living
$32,500
-
Average Wages
$66,000
-
Income Tax Rates
11.5%
-
Energy Rates
$0.03 per kW/hr
Looking for even more specs?