Madison Mega Site

An Entergy Qualified Site

A premier site in the heart of a growing industrial center

The Madison County Mega Site is located in a fast-growing and dynamic industrial region, the site offers advanced infrastructure and access to a skill and experienced workforce – all within a major southern metro

Learn More

Site Features

The Madison Mega Site is 1,025 acres (414.80 hectares) with an available 855 acres (346 hectares)

The site is undeveloped and offers unique features, such as the Mississippi Healthcare Zone

Ownership is public, and the sale is negotiable, based on panel location. Leasing is not an option.

The topography is gently rolling land outside of the city limits, and not in a flood zone.

The zoning is heavy industrial, and the surrounding land is used for commercial, agriculture, and timber industries.

Current Tenants: 750,000 S.F. Amazon Robotic Fulfillment Center

Site Due Diligence: (2018 Completed Surveys)

Infrastructure

Electric

  • Electrical Supplier

    Entergy

  • Distance to 3-Phase

    On-site

Water

  • Water Supplier

    Canton Municipal Utilities

  • Distance to main

    On-site

  • Diameter of Water Line

    16 inches (40.64cm)

  • Available Capacity

    2 MGD with the completion of a one-million gallon elevated tank. (2022 Q2 Completion Date)

Wastewater

  • Supplier

    Canton Municipal Utilities

Fiber/telecom

  • Supplier

    AT&T, C-Spire, Comcast Xfinity

NATURAL GAS

  • Supplier

    Canton Municipal Utilities

Workforce

6

Research UNIVERSITIES

12

FOUR-YEAR EDUCATIONAL INSTITUTUIONS

11

TWO-YEAR EDUCATIONAL INSTITUTUIONS

15

ACCELERATE MS PROGRAMS

Quality of Life

  • Cost of Living

    $32,500

  • Average Wages

    $66,000

  • Income Tax Rates

    11.5%

  • Energy Rates

    $0.03 per kW/hr

Looking for even more specs?

Contact
Contact Us Using The Form Below
Name(Required)